ADI Date Codes and Packages: A Companion to the Buying Guide
The date code and the package are one check, not two
A buying guide names the part to order. This companion guide covers the two things checked when the part arrives: the date code, which says when the part was made, and the package, which says what body it arrives in. The part that arrives is only right if both match the order: a right part number in the wrong package is a wrong delivery, and a right package with a date code nobody read is a delivery nobody checked.
This guide names no specific part number, because its subject is the check itself, not one chip. It explains how to read a date code, what a lot or batch means, how package and packing forms differ, how to run the receiving check, and how to tie the date code and the package into the inquiry.
How to read a date code
A date code is a short marking that states when a part was made. It is printed on the part itself or on its packing, and it is read against the order when the parts arrive. The code is short because it has to fit on a small body, so it must be read carefully.
- The date code states the time of manufacture. It tells the buyer when the part was made, in the maker's own code. That date is recorded at receiving, so the age of the parts on the shelf is always known.
- The code has a format, and the format must be known. A date code can carry the year and the week, the year and the month, or another arrangement the maker uses, as the maker's marking guide states. A code read in the wrong format gives a wrong date, so the format is confirmed before the code is interpreted.
- The year and the week are read together. Where the code carries a year and a week, the two are one statement: the year says which year, the week says which week, and both are recorded together.
For the general way date codes and lot codes are read on integrated circuits, see How to Read Date Codes and Lot Codes on ICs.
What a lot or batch means
A lot, also called a batch, is a group of parts made together under the same conditions, sharing one manufacturing run. Parts from different lots were made at different times or under different conditions, and the lot is how a delivery is divided into groups that can be traced.
- One lot is one group. Parts made together form one lot, and the lot code on the marking names that group. It is recorded at receiving, next to the date code, so every part on the shelf belongs to a known group.
- One lot, one record. Parts from different lots are kept as separate records, even in the same delivery: a single record that mixes lots cannot say which parts came from which run.
- Mixed lots are noted, and the two codes answer different questions. A single delivery can contain more than one lot, and that is not by itself a problem, but the mix is recorded lot by lot. The date code says when the parts were made, and the lot code says which manufacturing group they belong to, so both are read and recorded as separate fields.
Package forms: what body the part arrives in
The package is the physical body of the part, deciding the footprint on the board, the pin layout, and how the part is soldered or mounted. Two parts with the same function in different packages are different parts to order, to receive, and to assemble.
- The package decides the footprint. The footprint is the pattern of pads on the board the part sits on. A package that does not match the board footprint cannot be mounted, however right the part is in every other way.
- The package decides the pin layout. Which pin does what depends on the package, and the same function can sit on a different pin in a different package. The pin layout is confirmed against the board before the order is placed.
- Packages differ in size, height, and heat handling. A large package takes more board space, a tall package needs more clearance above the board, and packages differ in how they pass heat to the board. The package must suit the board, the enclosure, and the heat it will meet.
- The package is carried in the part number. The package is often carried by a character in the part number, so the part number must be copied in full. A part number with the package character dropped leaves the package to chance, and the part that arrives may be the right function in a body the board cannot take.
- The package is stated in the technical document. Which package the exact part comes in, and what its dimensions and pin layout are, is stated in its technical document and in the ordering guide. Both are read before the order is placed, and the package is written plainly in the inquiry.
For how suffixes in a part number carry package, grade, and packing information, see Suffixes in Part Numbers: Package, Grade, Packing.
Packing forms: reel, tray, and tube
Packing form is not the package: the package is the body of the part, and the packing form is how the parts travel and how they are fed to the assembly line. Reel, tray, and tube are the common forms, each suiting a different way of handling parts.
- A reel carries parts on a tape, wound for a machine. Parts on a reel arrive in a continuous tape that a pick-and-place machine feeds straight into assembly. A reel suits machine assembly in volume, and the form should be confirmed when the assembly line expects a reel.
- A tray carries parts in pockets, ready to be picked. Parts in a tray sit in individual pockets, picked one by one by machine or operator. A tray suits parts that are large, fragile, or handled in smaller numbers, and the form should match how the parts will be picked.
- A tube carries parts in a line, for hand or simple machine handling. Parts in a tube slide in a row, taken from the tube one at a time. A tube suits small runs and hand assembly, and the form should match how the parts will actually be handled.
- The packing form is part of the part number. Where the suffix carries the packing form, it decides how the parts arrive. A reel suffix means the parts arrive wound on a reel. The packing form should match how the parts will be handled and assembled, and it should be confirmed in the inquiry rather than assumed.
- The wrong packing form is a real cost. Parts in the wrong packing form may need repacking before assembly, may not feed the machine, or may be handled in a way that damages them. The packing form is therefore stated in the inquiry in plain words, not left to be guessed.
The receiving check, step by step
Receiving is the moment the order becomes a fact: the parts are in hand, the markings are visible, and every check planned before the order can now be run. A receiving check done well takes minutes, and one skipped can cost a whole build.
- Start with the outside of the delivery. The labels on the outer packing state the part number, the quantity, and often the lot and date codes, and they are read first and compared with the order before anything is opened.
- Open one unit and read the part marking. The part number on the part itself is compared with the order, character for character, suffix included. A part number copied without its suffix is an order for a family, and the receiving check is where that mistake is caught.
- Read the date code and record it. The date code is read from the marking on the part or its packing, in the format the marking guide states, and written down exactly as marked, into the stock record with the delivery.
- Read the lot code and record it separately. The lot code is read and recorded next to the date code, as its own field. Parts from different lots are recorded as separate lines, even in one delivery.
- Check the package against the order. The body of the part is compared with the package the order asked for: footprint, pin count, and general form. A part in the wrong package is stopped at the bench, not discovered at the assembly line.
- Check the packing form against the order. The reel, tray, or tube the parts arrived in is compared with the packing form the order asked for. A mismatch is noted and raised, because the packing form decides how the parts can be assembled.
- Count, then store by lot. The quantity is verified against the delivery note, and the parts go into stock grouped by lot, with the date code and lot code on the label.
- Any difference is a question before use. A part number that differs, a date code that cannot be read, a mixed lot nobody noted, or a packing form that does not match is a reason to stop and ask before the parts are used.
Tying the date code and the package into the inquiry
The receiving check can only confirm what the inquiry asked for. If the inquiry never stated the package, the packing form, or anything about date codes and lots, the receiving bench has nothing to compare with. The inquiry is where the receiving check is written in advance.
- Write the full part number, every time. The inquiry, the order, and the receiving check all carry the complete part number, suffix included, read against the ordering guide: one spelling across every document, character for character.
- State the package in plain words. The package the board needs is written in the inquiry next to the part number, so the reply can be checked against it, leaving no room for a quiet substitution.
- State the packing form in plain words. Reel, tray, or tube, written plainly, matched to how the parts will be assembled. The packing form is a requirement, not a preference to be guessed at.
- Ask how date codes and lots will be reported. The inquiry can ask the supplier to state the date codes and lot codes that will ship, and whether one delivery will contain one lot or several: an answer in writing before the order is a receiving check that starts before the parts leave the supplier.
Checklist before you send the inquiry
- Part number written in full — The complete number, suffix included, read against the ordering guide, with package and packing form confirmed.
- Package known — The body the board needs, confirmed in the technical document, with footprint and pin layout checked.
- Packing form stated — Reel, tray, or tube, written plainly, matched to the assembly line.
- Date code format known — How the maker's date code is arranged, so the code on the parts can be read and recorded.
- Lot handling stated — Whether one lot or several is acceptable, and how the supplier will report lot codes.
- Receiving check planned — Part number, date code, lot code, package, packing form, and quantity to be read and recorded when the parts arrive.
- Storage plan ready — Parts to be stored by lot, labelled with date code and lot code, so the shelf can answer questions later.
When the list is complete, the inquiry can be written in one pass. That inquiry goes to the inquiry page — written in full, so the answer can be checked line by line.
FAQ
How do I read an ADI date code if I have never seen one before?
Find the marking guide for the exact part, read the date code format there first, then read the code on the part or its packing in that format and write it down exactly as marked. Never read a date code from memory.
What is the difference between a date code and a lot code?
The date code says when the parts were made. The lot code says which manufacturing group they belong to, the group of parts made together under the same conditions. Both are read at receiving and recorded as separate fields: the date answers how old the parts are, and the lot answers which run they came from.
Does the packing form really matter if the part number is right?
Yes. The packing form decides how the parts arrive and how they can be assembled: a reel feeds a pick-and-place machine, a tray suits parts picked one by one, and a tube suits small runs and hand assembly. Parts in the wrong packing form may need repacking, may not feed the machine, or may be handled in a way that damages them.
What should I do if a delivery arrives with mixed lots or a date code I cannot read?
Stop at the receiving bench and ask before the parts are used. Record each lot as a separate line, note the unreadable code exactly as it appears, and raise both points with the supplier. A question asked at receiving is cheap compared with one asked after assembly.