Главная Статьи

Five Things to Confirm Within 24 Hours of Receiving a Quote

## Why 24 hours
A quote feels like progress, but it is only a piece of paper until it is tied to a specific part, a specific lot and specific terms. Most quote problems are discovered after payment, when fixing them costs money. Five checks, done within 24 hours of receiving the quote, catch the common ones while the supplier is still responsive and the price is still valid.
## 1. The full ordering number — suffix, package and packing included
Ask for the complete ordering number exactly as it will appear on the label and the packing list, including the suffix, the package code and the packing form (tape and reel, tray, tube or cut tape). A quote that says only the base part number is not a quote for a part you can use.
- Compare the ordering number against the datasheet ordering information, character by character. One wrong suffix can mean a different temperature grade, a different package or a different reel size.
- Confirm the packing form in writing. Cut tape and full reel are not the same thing, and neither is a tray. If your line needs a full reel, say so before you pay.
- If the quote lists a substitute or "equivalent" part, treat it as a different part. It needs its own datasheet check before you accept it.
## 2. Date code, lot and traceability — what stands behind the stock
A price without a lot behind it is a guess. Ask for the date code or lot code of the stock being offered, the country of origin, and what traceability paperwork comes with the shipment (certificate of conformance, original packing, or lot traceability where the manufacturer provides it).
- A date code that is years old is not automatically bad, but it needs a reason and a storage story. Ask how the parts were stored and whether solderability or moisture sensitivity applies.
- Mixed lots in one shipment should be listed separately, with quantities per lot. One line that hides three different date codes is a warning sign.
- If the supplier cannot name the lot at all, do not pay for "in stock" — ask how the stock will be confirmed before shipment. Our guide on how to verify a supplier's in-stock claim before you pay: https://joinxtec.com/en/insights/verify-supplier-stock-claims-before-payment/
## 3. What the price includes — and what it does not
A low unit price means little if freight, tax, testing or handling are added later. Ask for the total landed cost in writing, with each element named.
- Price validity: how many days is this price good for, and does it change if you split the order or delay shipment?
- Included and excluded: freight, insurance, import duty, tax, testing fees and handling. If any of these is "to be confirmed", the quote is not final.
- Payment terms: prepayment, net terms, or partial payment — and what happens to the price if payment is late. Confirm the currency as well; a quote in one currency paid in another is a different price.
- Minimum order quantity: confirm the MOQ and whether the quoted quantity is a full reel, a partial reel or a broken quantity, with the price for each.
## 4. Lead time and stock status — in stock, or to order
"In stock" and "available" are not the same thing. Ask whether the parts are physically on the shelf, when they ship, and what happens if the quantity you need is larger than the lot on hand.
- Ship date: a named day, not "about a week". Ask for the ship date in writing and what triggers it — payment, order confirmation, or something else.
- Partial shipment: if only part of the quantity is on hand, will the rest ship later, and at what price and date? Get the split in writing before you pay.
- Allocation: if the part is on allocation, ask how the supplier's allocation is confirmed and what happens if it slips. A quote that ignores allocation risk is not a plan.
## 5. Inspection and return terms — agreed before payment, not after
Agree on what happens if the parts are wrong, damaged or fail inspection — before you pay, when you still have leverage.
- Inspection: how many days do you have to inspect after delivery, and what counts as a failure — wrong part, wrong date code, damaged packing, failed solderability?
- Returns: who pays return freight, what restocking fee applies if any, and how long a refund or replacement takes.
- Evidence: ask what inspection report or photos come with the shipment, and keep your own photos of the labels and packing on arrival.
## A 24-hour checklist you can copy
- Full ordering number with suffix, package and packing form, checked against the datasheet
- Date code or lot code, country of origin, and traceability paperwork named
- Total landed cost in writing, with price validity, currency and payment terms
- Ship date in writing, partial-shipment plan if the lot is short
- Inspection window, return terms and who pays return freight, agreed before payment
If any of the five comes back vague, ask once more in writing. A supplier that answers clearly is worth more than a supplier that is merely cheap.
## FAQ
### How long should a quote stay valid?
There is no standard. Ask for the validity in days in writing, and treat a quote with no validity date as valid only until the supplier says otherwise. Re-confirm the price before paying if the validity has passed.
### The quote says "in stock" but gives no date code. Is that enough?
No. Ask for the date code or lot code of the stock being offered. A supplier that cannot name the lot has not confirmed stock — it has repeated a catalogue line.
### Should I accept a substitute part the supplier offers at a lower price?
Only after your own datasheet check: package, pinout, electrical ratings, temperature grade and firmware or configuration differences. A substitute is a different part until proven otherwise.
### What if the supplier will not put the terms in writing?
That is itself an answer. Written confirmation of the ordering number, lot, price, ship date and return terms is the minimum for a first order with a new supplier.
### Does JoinX confirm all five points before shipment?
Availability, lot and terms are confirmed for your specific inquiry. Send the full ordering number, quantity and packaging through the inquiry page https://joinxtec.com/en/inquiry/ and get the answer in writing for that lot. This week's new-product releases are covered in our weekly market summary https://joinxtec.com/en/insights/weekly-market-summary-november-13-2026/

По теме

How to Vet an Obsolete Electronic Components Distributor Before You Buy ↗ How to Read Date Codes on Electronic Components: Year, Week and Shelf Life ↗ Before You Pay: How to Verify a Supplier's In-Stock Claim ↗ Prototype vs. Production: Two Different Checklists for Sourcing Components ↗