Inspection Reports: COC, Photos and Lot Traceability

The papers arrive before the parts do. Read them first

In many component orders, the documents arrive before the shipment: a certificate of conformance, a set of photos, sometimes an inspection report, and a lot number quoted in the supplier's message. The buyer files them, waits for the parts, and only then discovers that the certificate names one lot and the photos show another, or that the lot number on the packing list matches nothing else in the file.

The mistake is treating the documents as a formality — papers to file, not papers to check. A certificate, a photo, and a lot number are three statements about the same goods, and their value lies in whether they agree with each other. When they agree, the buyer has a chain of evidence that the parts shipped are the parts ordered. When they do not agree, the buyer has found the problem before the parts are in hand, while the payment can still be held and the question can still be asked in writing.

This guide is about checking documents after they arrive. It is not about the physical inspection at receiving — what to look at on the parts themselves is covered in the receiving guide. This guide is about the papers: what each document should state, how to cross-check one document against another, and what to ask when they do not match.

The certificate of conformance: what it should state

A certificate of conformance — usually shortened to COC — is the supplier's written statement that the parts conform to a stated specification. It is a claim, signed by the supplier, and it is only as good as the details it carries.

  • The full part number, suffix included. The certificate should name the complete part number exactly as it appears on the order, including the suffix. A certificate that names only the base number certifies an undefined item: the package, the grade, or the packing form is left open, and the certificate cannot be tied to the parts that arrive. Compare the number on the certificate with the number on the order, character by character.
  • The quantity it covers. The certificate should state the quantity of parts it covers, and that quantity should match the quantity on the order and on the packing list, in the same counting unit as the order. A certificate that covers fewer parts than the shipment, or more, is a certificate for a different shipment.
  • The lot or date code it covers. The certificate should name the lot number, the date code, or both, for the parts it covers. A certificate with no lot identification certifies a type of part, not the parts in this shipment. For how date codes and lot codes are read, see How to Read Date Codes and Lot Codes on ICs.
  • The specification it conforms to. The certificate should name the specification the parts conform to — the datasheet, the standard, or the customer drawing — and the revision of that specification where a revision exists. A certificate that says only "conforms to specification" without naming which specification certifies nothing in particular. Ask for the specification to be named.
  • Who signed it, and when. A certificate should carry the name of the person or the function that issued it, the name of the issuing organisation, and the date of issue. A certificate with no issuer and no date cannot be traced back to anyone, and it cannot be shown to have been issued for this shipment rather than copied from an earlier one.
  • A certificate that passes these checks is a useful document. A certificate that fails one of them is not proof of anything yet — it is a document to ask about, in writing, before the parts are accepted. Note also what a certificate does not claim: it states that the parts conform to the specification named on it. It does not state that the parts are new, that they came from the original manufacturer, or that they were stored in any particular way, unless it says so in words.

Photos: what they should actually show

Suppliers often send photos with the shipment, or before it: photos of the parts, of the labels, of the packing. Photos are useful, but only when they show what the buyer needs to see, and only when they can be tied to the shipment they are supposed to show.

  • The marking on the part. A useful photo shows the marking on the part itself, clearly enough to read: the part number, the lot or date code, and any other marking the datasheet describes. A photo of a pile of parts, taken from a distance, shows that parts exist; it does not show which parts they are. Ask for a close photo of the marking, and compare it with the part number and the lot number on the certificate.
  • The label on the packing. A useful photo shows the label on the reel, the tray, the tube, or the box, with the part number, the quantity, and the lot number readable. The label is the link between the parts and the documents: the lot number on the label should be the lot number on the certificate and on the packing list.
  • The quantity, honestly shown. A photo can show that parts are packed, and it can show the form of packing — reel, tray, tube, or cut tape. It cannot show the full quantity of a large order, and a buyer should not expect it to. What a photo can show is the packing form, and whether the form matches the order. If the order asked for reels and the photo shows parts loose in a bag, the packing does not match, whatever the quantity is.
  • The condition of the packing. A photo can show whether the packing is sealed, whether the reel is intact, and whether the moisture barrier bag — where the part requires one — is present and unopened. Ask for a photo of the packing as it will be shipped, not a photo of a sample taken months earlier.
  • When the photo was taken. A photo carries no date unless the supplier states one, and a photo of the right parts taken for a different order is a photo of the wrong shipment. Ask the supplier to confirm in writing that the photos are of the parts in this shipment, and to state the date they were taken.
  • What a photo cannot prove. A photo shows the outside of a part. It does not show what is inside the package, it does not show the electrical behaviour of the part, and it does not show whether the part was stored correctly before the photo was taken. Photos support the documents; they do not replace them.

Lot traceability: reading the chain from document to document

Lot traceability means that the same lot can be followed from one document to the next — from the order, to the certificate, to the packing list, to the label on the parts — and that every document names the same lot. The chain is the evidence; a single document is only one link.

  • Start with the order. Write down the lot number the order names, if the order names one. If the order does not name a lot, the first question is whether the supplier can name one: a shipment with no lot number anywhere in the file has no traceability at all.
  • Follow the lot through the certificate. The lot number on the certificate should be the lot number on the order. If the certificate names a different lot, the certificate belongs to a different shipment, and the buyer should ask which lot the certificate actually covers.
  • Follow the lot through the packing list. The packing list should name the lot number for each line, and the lot numbers on it should match the certificate. A packing list that names no lot, or that names a lot the certificate does not mention, breaks the chain.
  • Follow the lot to the label. The label on the packing should carry the same lot number as the certificate and the packing list. Compare the label with the documents before opening the package. If the label differs, do not open the package until the supplier has explained the difference in writing.
  • Watch for a lot that changes between documents. The most common break in the chain is a lot number that is one thing on the certificate and another on the label, with no explanation. Sometimes the difference is a typing error; sometimes the shipment mixes two lots, and only one of them is certified. Either way, the buyer should not guess which lot the parts belong to. Ask the supplier to state, in writing, which lots are in the shipment, and which certificate covers each one.
  • Keep the chain together. File the order, the certificate, the packing list, the photos, and the supplier's written answers together, under the same order number. If a question arises later — a failure in the field, a claim, a return — the file shows which lot was shipped, which documents covered it, and what the supplier said about it at the time. For how to verify a lot before payment, see How to Verify a Supplier's Lot Before Payment.

When the papers do not match

  • Name the two documents and the two versions. State the lot number as it appears on the certificate and the lot number as it appears on the label, side by side, with the document names. The supplier should not have to guess what the buyer is objecting to.
  • Ask for a corrected document, not a verbal fix. A correction given in conversation disappears. Ask the supplier to reissue the certificate, the packing list, or the label information with the corrected lot number, so the document the buyer accepts is the document the buyer checked.
  • Ask one question per mismatch. If the certificate and the packing list disagree, and the photos show a third lot number, ask about each disagreement separately. A bundled question gets a bundled answer, and bundled answers hide the correction the buyer needs.
  • Do not accept a mismatch by silence. Accepting parts whose documents do not agree is accepting the disagreement. If the supplier cannot produce a certificate for the lot that is actually shipped, ask them to say so in writing, and to state what they can certify instead.

Inspection documents checklist

  • Certificate checked — Full part number, quantity, lot or date code, specification named, issuer and date present, and no claim read into it that it does not make.
  • Photos checked — Marking on the part readable, label on the packing readable, packing form matches the order, photos confirmed as being of this shipment.
  • Lot chain checked — The same lot number appears on the order, the certificate, the packing list, and the label, with no unexplained change between documents.
  • Quantities agree — The quantity on the certificate matches the quantity on the order and on the packing list, in the same counting unit.
  • Mismatches corrected in writing — Corrected documents reissued, originals filed alongside them, and payment held until the papers agree.

Documents that agree with each other are the quietest form of quality evidence a buyer gets: no drama, no dispute, just a chain that holds from the order to the label. When you are ready to request a quote, the inquiry page is where the full part number, the quantity, and the packing form go in one request — and where the inspection documents you want with the shipment can be named in the same message.

FAQ

The certificate names a different lot number from the label on the box. Can I accept the parts?

No — not until the supplier explains the difference in writing. The certificate and the label are two statements about the same shipment, and they cannot both be right if they name different lots. Ask the supplier to state which lots are in the shipment and which certificate covers each one, and to reissue the corrected document. Do not open the package until the answer arrives.

The supplier sent photos, but the part marking is too small to read. What should I ask for?

Ask for a close photo of the marking on the part itself, taken so the part number and the lot or date code can be read, and a photo of the label on the packing with the same numbers readable. A photo of a pile of parts from a distance shows that parts exist; it does not show which parts they are. Ask the supplier to confirm in writing that the photos are of the parts in this shipment, and to state the date they were taken.

The certificate says the parts conform to specification but does not name the specification. Is that enough?

No. A certificate that says only "conforms to specification" without naming which specification certifies nothing in particular. Ask the supplier to name the specification — the datasheet, the standard, or the customer drawing — and the revision of that specification where a revision exists. Also remember what a certificate does not claim: it does not state that the parts are new, that they came from the original manufacturer, or that they were stored in any particular way, unless it says so in words.

The packing list names no lot number at all. What do I do?

Ask the supplier to identify the lot in writing before you accept the parts. A shipment with no lot number anywhere in the file has no traceability: the lot cannot be followed from the order to the certificate to the label, and a question that arises later — a failure, a claim, a return — cannot be tied to a lot. Ask for the packing list to be corrected with the lot number for each line, and check the corrected lot number against the certificate and the label.